XXXX
XXXX
Studies for replacing two boiler units and adding waste-heat recovery at an existing power and water station. Contractor not yet appointed.
Front-end engineering for a third processing train and a new sulphur recovery unit, with the process safety studies running alongside the design.
New process modules and a revised flare system installed on a wellhead platform, completed without a shutdown of the neighbouring platforms.